Codice prodotto
Faggio Bianco
Tipologia
Rivestimento murale
Materiale
Melaminico non fonoassorbente
Collezione
Decoro
Sensazione al tatto
Legno
Posa
Maschio e femmina
Caratteristiche
Facile manutenzione
Facile pulizia
Lavabile
No colla
Non richiede ceratura
Posa facile e semplice
Removibile
Riutilizzabile
Utilizzi consigliati
Camere albergo
Centro convegni
Hotel
Ostelli
Sale polifunzionali
Teatri
Aule magne
Biblioteche
Scuole
Asili
Autosaloni
Negozi
Showroom
Supermercati
Bar
Fast-food
Mense
Ristorante
Take away
Locali server
Sale CED
Formati disponibili
Doga
codice formato: ET32X300X216X06
Larghezza
2400 mm
Lunghezza
288 mm
Spessore
14 mm
Confezione
0.96 m2
Peso
10.8 kg/m2
Evolution Tecnick

Evolution Tecnick

A system of daily life-proof wall claddings and suspended ceilings offering high aesthetic value and easy maintenance and cleaning.

Versions available
TECNICK 30.2

Grooves 2 mm pitch 32 mm,
Drilled back Ø 10 mm - Pitch 32x16 mm

TECNICK 30.2
TECNICK 14.2

Grooves 2 mm pitch 16 mm,
Drilled back Ø 10 mm - Pitch 16x16 mm

TECNICK 14.2
TECNICK 29.3

Grooves 3 mm pitch 32 mm,
Drilled back Ø 10 mm - Pitch 32x16 mm

TECNICK 29.3
TECNICK 13.3

Grooves 3 mm pitch 16 mm,
Drilled back Ø 10 mm - Pitch 16x16 mm

TECNICK 13.3
TECNICK 28.4

Grooves 4 mm pitch 32 mm,
Drilled back Ø 10 mm - Pitch 32x16 mm

TECNICK 28.4
TECNICK 12.4

Grooves 4 mm pitch 16 mm,
Drilled back Ø 10 mm - Pitch 16x16 mm

TECNICK 12.4

Material Composition

The wall panel and suspended ceiling system. Evolution Tecnick is made up of staves, formed by sectioned combination of a fire-resistant MDF backing and a DPL laminate or lacquered external decorative surface, suitably balanced. The staves have milled grooves parallel to the long side on the visible face, and on the groove (female) part in the depth.

Material Composition

Installation instructions

Panels may only be installed in enclosed spaces which have windows and doors installed and where there is a constant temperature between 15° and 25°C; before installation, panels must be left to acclimatize in the rooms where they will be installed for a period of at least 7 days. Plastering, screeding and other wet work must be completed at least 45 days before suspended ceiling or cladding installation.

Installation instructions

Cleaning and maintenance

Panels generally do not require any maintenance; if in use in dusty environments, dust removal with a dry cloth or vacuum cleaner is sufficient. Water and moisture tend to damage the surface of the panels and cause the MDF backing to swell. Any stains can be removed with a (well-wrung) wet cloth and neutral liquid detergent.

Cleaning and maintenance

Contact us for any information about our products

You may also be interested in...
Evolution Panel
Evolution Panel
Un sistema di contropareti e controsoffitti tecnici ad elevata capacità di assorbimento acustico
Evolution Wall
Evolution Wall
Un sistema di contropareti e controsoffitti bello da vedere e pratico, a prova di quotidianità.
Evolution Vertical
Evolution Vertical
Una superficie bella e funzionale, appositamente studiata per i rivestimenti murali interni
Buflon Mousse
Buflon Mousse
Un rivestimento murale versatile, grazie alle sue caratteristiche uniche: bello da vedere e con una varietà di decori
Accedi per scaricare cataloghi, materiale tecnico e utilizzare servizi a te riservati.

Informativa sulla privacy e gestione dei cookie

Questo sito utilizza cookie di profilazione di terze parti per inviarti messaggi pubblicitari mirati e servizi in linea con le tue preferenze. Se vuoi saperne di piuÌ€ o negare il consenso a tutti o ad alcuni cookie leggi l’informativa estesa sui cookie.
Acconsenti all’uso dei cookie per poter proseguire la navigazione.
Stai utilizzando un browser obsoleto.

Per visualizzare correttamente il sito Virag ti preghiamo di utilizzare il nuovo browser Microsoft Edge oppure installa Google Chrome
OK