Codice prodotto
EV 5001
Tipologia
Pavimento
Materiale
LVT
Collezione
Decoro
Cemento
Sensazione al tatto
Cemento
Posa
Removibile
Caratteristiche
Riutilizzabile
Facile manutenzione
Facile pulizia
Immediatamente pedonabile
Lavabile
Non richiede ceratura
Posa facile e semplice
Posa pulita
Removibile
Resistente all'umidità
Utilizzi consigliati
Ristorante
Take away
Bar
Fast-food
Mense
Biblioteche
Scuole
Asili
Aule magne
Camere albergo
Centro convegni
Hotel
Ostelli
Sale polifunzionali
Teatri
Negozi
Showroom
Stand Fieristico
Supermercati
Toilette
Uffici
Formati disponibili
Piastrella
codice formato: EVCPV18X36X5001
Larghezza
457 mm
Lunghezza
914 mm
Spessore
5 mm
Confezione
2.51 m2
Peso
19 kg/m2
Evolution Velox

Evolution Velox

Evolution Velox is particularly suitable for laying on raised floors.
The use of the special glue with a peel-off effect allows a very fast and effortless installation.
It is made up of 8 layers which are hot-coupled by pressing.

Usage classes and classifications

Composition

Vinyl floor consisting of:

- 0.55 mm wear layer made of pure transparent PVC

- 0.10mm printed layer in pure PVC printed with innovative techniques

- 0.80 mm intermediate stabilizer anti torsion layer

- 0.10 mm stabilizing fibreglass sheet

- 0.80 mm intermediate stabilizer anti torsion layer

- 0.10 mm stabilizing fibreglass sheet

- 2.45 mm stabilizing anti torsion layer

- 0.10 bonding layer

The components are hot-coupled by
non-continuous pressing.

Composition
Installation instructions

Pile up the boxes of Evolution Velox in stacks up to a maximum of 7 boxes, in the same room where the installation will take place. 
Acclimatize the material at least 24 hours prior to starting the installation at a minimum temperature of 18°C. T
he temperature must be kept all along the installation.
The substrate minimum temperature must be around 13°C with and the relative humidity inside the room should be between 35% and 65%.

The substrate must be flat, smooth, dry, solid, free of cracks, stable and moisture-proof.
Choose the leveling grout to be used following the manufacturer's instructions according to the type of foot traffic the installed floor will be subject to.

The correct functioning of the heating system must be checked prior to starting the installation work.
Make sure that the underfloor heating is switched off at least 48 hours prior to the installation and that it stays switched off for at least 48 hours after installation is complete.
When the heating system is switched on again, gradually increase the temperature over several days, increasing by a few degrees each day, until the desired temperature is reached.
The temperature must never exceed 27°C on the backing of the floor in contact with the substrate. 

Prior to starting the installation, determine the type to be followed taking into account the shape of the room and the light angle of incidence. 
Prior to installing the first row of planks, check that the planks cut close to the wall have a width of at least 10 cm. 
Near doors and corners, the cut planks cannot be less than half of a whole plank. 
The planks have arrows on their back showing the installation direction.

Use an adhesive such as Mapei Ultrabond Eco Tack 4 LVT.
Apply according to the methods and quantities shown by the manufacturer.
Be sure to apply enough so the floor does not get "slippery".
Check whether the application of a suitable primer is required to regulate absorbency.
Fix the planks next to each other.
Apply a roller. In given conditions (ramps, steps, areas subject to intense solar heat), it is necessary to use a permanent bonding adhesive.

Stand by 48 to 72 hours prior to opening the area to foot traffic and moving furniture.
In case of work to be carried out after installation, the floor must be protected with suitable rigid cardboard or plywood panels. If you need to use duct tape, do not apply it directly onto the floor.
Do not subject newly installed surfaces to heavy traffic with wheels as this may cause the slats and planks to slide.

Use an adhesive such as Mapei Ultrabond Eco Tack 4 LVT. Apply according to the methods and quantities shown by the manufacturer.
Be sure to apply enough so the floor does not get "slippery".
Check whether the application of a suitable primer is required to regulate absorbency.
Fix the planks next to each other.
Apply a roller.
In given conditions (ramps, steps, areas subject to intense solar heat), it is necessary to use a permanent bonding adhesive.

Stand by 48 to 72 hours prior to opening the area to foot traffic and moving furniture.
In case of work to be carried out after installation, the floor must be protected with suitable rigid cardboard or plywood panels.
If you need to use duct tape, do not apply it directly onto the floor.
Do not subject newly installed surfaces to heavy traffic with wheels as this may cause the slats and planks to slide.

Installation instructions

Cleaning and maintenance instructions

A surface careful cleaning is recommended at the end of the installation.
Any adhesive residues must be removed using denatured ethyl alcohol and a dry cloth.

If there are stains, use a detergent such as Evo Virag, then remove dirt and dust residues with a damp or dry cloth.

Cleaning and maintenance instructions

Contact us for any information about our products

You may also be interested in...
Evolution Tack Dry Plus
Evolution Tack Dry Plus
Evolution Tackdry è un innovativo pavimento in LVT autoposante certificato CE, per un'extra praticità
Accedi per scaricare cataloghi, materiale tecnico e utilizzare servizi a te riservati.

Informativa sulla privacy e gestione dei cookie

Questo sito utilizza cookie di profilazione di terze parti per inviarti messaggi pubblicitari mirati e servizi in linea con le tue preferenze. Se vuoi saperne di piuÌ€ o negare il consenso a tutti o ad alcuni cookie leggi l’informativa estesa sui cookie.
Acconsenti all’uso dei cookie per poter proseguire la navigazione.
Stai utilizzando un browser obsoleto.

Per visualizzare correttamente il sito Virag ti preghiamo di utilizzare il nuovo browser Microsoft Edge oppure installa Google Chrome
OK